Project Code: WEYDV-02-025
Area:Field Operations
Sponsor:Weyerhaeuser Canada Ltd.

This Project identified and conducted fill-in planting for small non-stocked patches within cutblocks already declared Sufficiently Restocked (SR). This included site preparation which was completed on 23 blocks on the Drayton Valley FMA and 24 blocks on the Edson FMA. The Edson blocks were all summer planted with the Edson blocks having planting completed in the spring of 1999 due to stock shortages and fire reforestation efforts.