Project Code: | ANC-01-008 |
Program: | FRIP |
Area: | Field Operations |
Sponsor: | ANC Timber Ltd. |
Project Status: | Completed |
Object and Deliverables
The Project was undertaken to complete a portion of the site preparation and planting work recommended in the Remedial Silviculture Report for CTL W1-L29.
Final Report
The completed silviculture treatments included 57.4 hectares mechanicallly site prepared with a excavator/mounder; and 90.6 hectares planted with no pre-planting site preparation. Planting quality was an average of 97.9%.
ANC-01-008