Project Code: | MW-01-066 |
Program: | FRIP |
Area: | Inventory and Planning |
Sponsor: | Millar Western Forest |
Object & Deliverables
The principal aim of this Project was to inventory old cutovers and plan a “next” management strategy(s).
Specific Project objectives included provision of a detailed AVI Inventory for each cutblock harvested in Forest
Management Units A-14 [Clearwater River Operating Area] & L-03 on or before 1993; and provision of a “next” management strategy for each cutblock inventoried.
The field work associated with Phase I [RSI Inventory] of this Project was carried out over the period – Spring 1998 to June 2001, while Phase II [development of the Algorithm and Yield Analysis] was completed during 2001.
During the life of the Project – 21,583.78 hectares of Regenerated Stand Inventory was completed [18,140.48 ha. in FMU L- O3; 2923 ha. in A-14; & 520.3 ha. of non-harvested areas within harvested boundaries]. In addition the “Algorithm” was completed and a few iterations run in the Timber Supply Analysis.
Final Report
The Project results are briefly summarized in a five page report entitled “Regenerated Stand Inventory – Final Report”, prepared by Ron Sparrow & David J. Flynn, and dated July 11th, 2003.
The RSI Inventory is available either as a database and/or GIS Cover through Millar Western’s Boyle Office. Payment of reproduction costs will be required. Additionally the “Algorithm” is available through the same office.
Keywords
Regenerated Stand Inventory
Millar Western Forest Products
FMU’s L-03 and A-14
Updated AVI Inventory
MW-01-066