Project Code: | TOLKHL-01-064 |
Program: | FRIP |
Sponsor: | Tolko Industries Ltd. |
Project Status: | Completed |
Object & Deliverables
The proposal was for the planned re-measurement of FRIP Projects TOLKHL-01-030 and TOLKHL-01-049. This is Phase 3 of the 10 year re-measurement.
The study was initiated in 2007 to examine the use of pulsed aerial spray treatments to create a mixedwood mosaic of spruce and vertically structured aspen/spruce patches.
Final Report
The final report was submitted by Dr. Phil Comeau in January 2020.
TOLKHL-01-064